Sunday, November 9, 2014

Pickets Continued

We spent Friday and Saturday night at the cabin. Saturday and Sunday we worked towards trying to get the lower half of the cabin clad in pickets.  The electrical outlets, windows, and door were easier to work around than we first assumed.  The biggest challenge to this project is making sure that you are moving the material in an efficient manor.  Having Alaina on the chop saw outside was a huge time saver.  It has its gaps and flaws, but that is what old wood does.  Regardless, it sure is easy to attach stuff to the walls.